The 20” line had suffered from internal erosion. This resulted in through wall defects on the flange.
20″ Inlet Pipework to seawater

The 20” line had suffered from internal erosion. This resulted in through wall defects on the flange.
The 8” steam header had suffered from internal erosion causing a through wall defect.
The water tank had suffered from possible internal acid corrosion.
The 30” Crude oil line had suffered from (CUI) external corrosion.
The 48” Cooling Water line had suffered from external and internal corrosion.
The 4” pilot valve was leaking from its rubber diaphragm
The ½” hydrocarbon gasoline line has suffered from internal, external corrosion.
The 10” Benzene line had suffered from severe CUI. This resulted in several large corroded areas resulting in multiple through wall defects.
The natural gas Housing filter was weeping from the valve bonnet.
The 4” Condensate line had suffered from coating damage resulting in a localised corrosion area.