Concerns of internal wall thinning at the weld of the reducer


Nature of Defect
There are concerns of internal wall thinning at the weld of the reducer. A composite repair was required to hold back any through wall defect that may occur in the future.
Solution
Metalyte Pipeworks solution was to apply 6 layers of their bespoke field applied composite system. This would hold back any leaking issues and build the strength back in to the line for full operational requirements.
Repair Method
The full length of the line was hand prepped to Sa 2.5 to gain the surface profile required for the composite to adhere to. The pipe surface then had a resin bond coat applied prior to the application of the composite. The line was then wrapped in 6 layers of composite and allowed to cure.